Client : Milnbank Housing Association
Location : Glasgow
Externally the works consisted of the replacement of the existing roof coverings including timber fascia and soffits, as well as the introduction of a new structural frame installed above the existing roof deck and connected through to the existing primary structural timber frame. Internally the works comprised of structural improvement works to the existing roof structure, alterations to the existing M&E Installations, removal and replacement of existing water damaged ceilings including insulation, light fittings, fire and intruder alarm installations and re-decoration of the existing nursery.
The nursery remained live throughout the duration of the project, with the works successfully undertaken over seventeen phases, five of which were out of hours. Prior to the commencement of the Construction Phase, we erected a fully tented structure to protect the building prior to stripping the existing roof covering. We then proceeded to record moisture levels of the existing roof structure over a period of six months. During this period we worked closely with the Design Team to develop a suitable construction solution that enabled the nursery to remain open during the works and ensured that the structural integrity of the building was maintained. We engaged with the nursery throughout the duration of the project and provided weekly updates of all works planned, advising of any road closures, noisy operations or any other works that had the potential to cause disruption. Additional care was taken to ensure that all site activities complied with Covid-19 guidelines while working in and around nursery staff and parents